Page 10 - Opal_sustainability_report_2022
P. 10
Working towards our 2030 target
Current success stories Working towards 2030
Lal Lal Wind Farm Onsite Renewable Energy Intensity Renewable Heat Procurement of Energy from Future Energy Renewable Gas
Electricity Supply Generation Improvement from Biomass Green Electricity Waste Efficiency Gains Investigation
Opal Group Opal operates the Opal Fibre In 2021, 46% of the Opal is Opal is in the late Opal is constantly Opal is a member
procures 26% of largest baseload Packaging has Opal Group's total investigating stage development seeking gains in of a renewable gas
the electricity we renewable actively chased thermal energy multiple green process for a energy efficiency working group
consume from electricity energy efficiency requirements energy projects to Energy from Waste and has a target which is tackling
the Lal Lal Wind generator in improvements with was supplied form part of Opal’s facility located at of a 1% efficiency the challenges
Farm, located in Victoria, powered success. from renewable electricity supply our Maryvale Mill. improvement in of transitioning
the Moorabool by biomass. We Energy intensity biomass. solution into the As part of our energy year on renewable gas
Shire near Ballarat, also operate a has fallen between future. circular economy year. into a reality.
Victoria. biogas generator 5%-10% since 2017. We are committed approach this will
in NSW, fuelled by to progressively divert waste from
gas from our waste sourcing more of landfill, reduce
water treatment our electricity from carbon emissions
plant. renewable assets. and supply Opal
26% of the with energy.
electricity we
consume is
generated onsite
by renewable
sources of solar,
biogas and
biomass.
10